Community Home

Latest Discussion Posts

Please login to see all eligible discussion postings

Either the content you're seeking doesn't exist or it requires proper authentication before viewing.

Latest Shared Files

Log in to see this information

Either the content you're seeking doesn't exist or it requires proper authentication before viewing.

Compliance Tips

  • FGI Guidelines for the Design and Construction of Hospitals and Outpatient Facilities – 2014: 1-2.3.2.3.1 A written plan, referred to as Infection Control Risk Mitigation Recommendations (ICRMR) is required to describe specific measures that ...

  • NFPA 101-2012: 9.4.6.2 All elevators equipped with fire fighters’ emergency operations in accordance with 9.4.3 shall be subject to a monthly operation with a written record of the findings made and kept on the premises as required byASMEA17.1/CSA ...

  • NFPA 25-2011: 5.3.1 5.3.1.1.1.3* Sprinklers manufactured using fast-response elements that have been in service for 20 years shall be replaced, or representative samples shall be tested and then retested at 10-year intervals. A quick-response sprinkler, ...

    1 person likes this.

Most Active Members

Log in to see this information